Mar 3, 2014

Let's complete

Construction of the villa did not advance as a slow 

since the beginning of the stage and finishing  

the side blow of wind and rain rainy season

the difficulty of arrangements of the craftsman 

 in the construction boom overlap.
 
 

This few days, it has become climate is 


 perfect to finish may take weather.

Now already, let's completion.









Doors and windows so that the final painting
  and installation work, construction completion.
















 




 Installation of lighting and the pool pump is complete.

Test whether it is flowing well in filled with water soon.













Toilet in the master bedroom on the second floor.

It is a toilet scenic.


















Will be introduced the TOTO Washlet.

Delivery time is 4 months for import


 I will take considerable time.

The installation scheduled for this month!


Villa is the planned construction a total 

of two buildings.




 




1 first building will be completed by 


the end of the month now.

I am sold with ownership.

CONTACT HORAS INDONESIA.
 
 

What the Quarry Natural Stone?

Marble and granite, is the industry ordinary be done consistently processing from where it was a large-scale development, to quarry the block opens up a mountain in our own, and to export.
MARBLE FACTORY

Rather than granite or marble, natural stone Horus is handled, has been exporting natural stone such as limestone and sandstone.

Material of stone (block), villagers deep in the mountains is by using a pickaxe and a chain saw, most will continue to dig manually.

Transported to a small factory in the village, where Have taken off the block.

NATURAL STONE SMALL QUARRY
 Have worked with polished or you can cut the stone block at the factory.

Based on the information and skills location of the plant and villagers that sells this stone block, and chose a stone block along the request of our customers, of choosing the factory by producer of stone and quality level, Horus is, of stone I will do the coordination.

Quarry stone of natural stone, is mostly small. You will end up moving material since there is no digging When you have a few months.

Therefore, quite difficult to be large-scale investments such as the introduction of equipment and maintenance of the road is the current situation.


 But simply because a small factory and quarry, on the other hand is, get to answer the request fine Horus. It is also the chance that you can contribute to the increased income of the poor villagers of the mountains in return, and ask them to improve the technology of the people working at the factory in the village.
To carry out the work in such a way that the developed world is difficult. However, to continue efforts in the hope that it can help when you are in the improvement of the living standards of their they incorporate the good work, such as new technologies and methods, even little by little.

Feb 5, 2014

Just a bit more...

Completion of the villa is also just followed


2ND BEDROOM

When heavy rain falls on Chinese New Year,  

there is a jinx economy is good that year.

This year, heavy rain has been falling all over Indonesia.
  Water under the eaves is still remain submerged in flood




even after two weeks in Jakarta.

 In Kudus village in Central Java,where the 
country side of the craftsmen 
 who are working in the field of our project, Influenced.
Arrange bus so that it can get to another person 
as a result of, river flooding in East Java now.
Blocked the way of the bus, and then starting the
  countryside It took three days to arrive to the site


 I belong to the final sprint finish (?!) Now.

Flooring in the bedroom, is where you begin to paint.


On the balcony of the master bedroom

Handrail has been installed.
  
From the balcony we overlooks the mountains of Bali
that's a wonderful view !
 
 Bathroom of the master bedroom also attach the device, 
such as a faucet or toilet,

It is completed by attaching the glass door of the toilet.

In the bath, We provided with a washing space to wash 
the body in front of Bathtub.

Now, you can soak in the bathtub it after washing 
 the body outside! That's good for save water.



 Toilet, bidet of TOTO

Toilet  in master bedroom and 1F living 

will be set up TOTO WASHLET type TCF491A. 













Master bedroom. Carry-in closet from next week.

We will finish the painting works for wall and floor
 within this week.

The ceiling design in the Master bedroom ,
exposed structure of the roof ,high ceilings.



After furniture set up the, atmosphere will changes,
 stay tuned!



 ANN LIVING & ESTATE VILLA is will be sold  
with FREE HOLD LAND now.

Please contact to PT.HORAS INDONESIA.




Feb 4, 2014

Neighborhood

In the neighborhood of ANN LIVING & ESTATE VILLA, there are three units a private villa.

Others are broad grassland. It is a cool environment at night very quiet.

But, the environment seems varies dramatically this peripheral After a couple of years later.

In the neighborhood of about 200 meters west of the ANN LIVING & ESTATE VILLA is,

Of GWK Garuda Wisunu Kunchana National Park Construction 


work of the building of 127 m height has begun.

Just 2 minutes walk from Ann Living & Estate villa, the project of GWK building construction has begun.



Foundation construction of high-rise buildings of GWK began on the site of about 
just two minutes walk away from ANN LIVING & ESTATE VILLA.
Speaking of 127 m, height far in excess of 97 m Statue of Liberty in New York.
Site of GWK project. Can see the existing statue of Wisnu in the middle.
Road is passed through newly to GWK direction, construction of villas is planned.

In addition, at the 1-minute drive to Pecatu area from ANN LIVING & ESTATE VILLA is

Construction work of the International School of the three-story rebar has already begun.



Now, the development of ANN LIVING & ESTATE VILLA peripheral seems will accelerate.

  ANN LIVING & ESTATE VILLA, sells land ownership with right now.

Contact us, to PT.HORAS INDONESIA.

Jan 30, 2014

STRONG IN THE RAIN



 ANN LIVING & ESTATE VILLA, even  located on the UNGASAN hill, it is unrelated to the flood,

Intermittent rain like a storm which started from December was a very hard to doing work 


on the construction site.

 Finish wall painting and wood flooring, it's no good finish when raining

so had postponed all the way until the sunny interval.

Good weather has come after entering in late January, We starting in the work of the paint finish.


 

 

 

HORAS INDONESIA  also export and sale of stone.

It was will post pictures of this villa in the catalog of stone.

And I thought I would attempt to shoot for 

the catalog published in the villa after completion

but finished too late.

Ask a professional photographer

 I had taken only a part of the wall of the living room.

 Shooting villas are accustomed to because they always do,

It's just wall to shoot it the first time.  He said. 



 
  The front of the villa has also gradually see the finish.

I am working on outside events.
First of all, the person who came to see from the front is said."it's a small house!" 
 
Yes, our concept itself of Machiya, it looks small, but inside is spacious.

Once inside, it will be surprised to the size of the space.
The View from Kitchen to the court yard.


 Wall now also one more times, until the paint to leave the final finish.

Wind will blow as missing very spacious hallway on the second floor.

It is the best place to nap.

The corridor on 2nd floor. you can feel the good winds.

 Also in the second bedroom

Flooring has installed, and only leave the paint finish after.

Furniture will be carried soon.


2nd Bedroom flooring wood merbau used.

 ANN LIVING & ESTATE VILLA, sells land ownership with.

If you are interested, please contact PT.HORAS INDONESIA.






Jan 2, 2014

A HAPPY NEW YEAR ! ANN LIVING & ESTATE VILLA NOW PROCESS TO FINISHING

Now the final stage project of ANN LIVING & ESTATE VILLA.

Now we are doing install window and paint wall finishing and installing wood floor.

In December 2013, construction was aborted with intermittent heavy rain.

 

We will finish it to find a fine day.


The basin of the rest room on the 1st floor,

we will put the wash bowl of 

TAMBA-YAKI ware, 

which requested to Japanese artists,to made ​​

just for this villa. Muted colors of blue green,

it looks the sense of quality ! 



The wall finishing in the living room




make texture like SUNA KABE, 

the traditional Japanese finishing textured wall.



 

Installed the window glass... 
  
The wall of the corridor on one surface

Use BLACK KEROBOKAN stone,


the natural stone of Indonesia.

It was in a calm atmosphere.


Installing the floor of the master bedroom

Merbau wood
flooring.

It is the floor feeling good even walk barefoot.

Dec 7, 2013

WITH FEELING TO FINISH DETAILS. ANN LIVING & ESTATE VILLA

Finish has also entered the final stage finally .The point of the design,depend on the politeness of the work of craftsmen .Method of Indonesia after wall of stacked brick Plasterer works.

This work  requires the work of good skill to make a flat wall.








A pool in the courtyard work of stone almost has finished.
We use Sukabumi Green Stone at inside pool, and outside overflow using Candi Stone.Floor leading to the pool deck will be .












The wall of the corridor using 

the Black Kerobokan .I became atmosphere chic and elegant .Pillar of two reminiscent of toriiI have to design a symmetric .




The Installation of the floor of the corridor on the second floor .We applying a granite tile of ebony grain print .  
It's better than solid wood flooring because it is semi- outdoor, long-lasting , maintenance is simple.  
It will be looks very elegant with a luxurious dark wood grain .


The 2nd bedroom's window 
 with the motif of the "MUSHIKAGO-MADO
(It's mean looks like insect cage window) of MACHIYA - KYOTO.  

Elongated windows and small,  
has the effect of hard to see the 
inside from the outside.
It is often used in the window of 

 the second floor in front bilding 
at MACHIYA.













The door frame of the entrance

Has been installed.


Also water tank ,pump and balancing Room

I will get on with finishing the rest.

An outdoor shower deck is laid on the top.