Now the final stage project of ANN LIVING & ESTATE VILLA.
Now we are doing install window and paint wall finishing and installing wood floor.
In December 2013, construction was aborted with intermittent heavy rain.
We will finish it to find a fine day.
The basin of the rest room on the 1st floor,
we will put the wash bowl of
TAMBA-YAKI ware,
which requested to Japanese artists,to made
just for this villa. Muted colors of blue green,
it looks the sense of quality !
The wall finishing in the living room
make texture like SUNA KABE,
the traditional Japanese finishing textured wall.
The wall of the corridor on one surface
Use BLACK KEROBOKAN stone,
the natural stone of Indonesia.
It was in a calm atmosphere.
Installing the floor of the master bedroom
Merbau wood flooring.
It is the floor feeling good even walk barefoot.
Now we are doing install window and paint wall finishing and installing wood floor.
In December 2013, construction was aborted with intermittent heavy rain.
We will finish it to find a fine day.
The basin of the rest room on the 1st floor,
we will put the wash bowl of
TAMBA-YAKI ware,
which requested to Japanese artists,to made
just for this villa. Muted colors of blue green,
it looks the sense of quality !
The wall finishing in the living room
make texture like SUNA KABE,
the traditional Japanese finishing textured wall.
Installed the window glass...
The wall of the corridor on one surface
Use BLACK KEROBOKAN stone,
the natural stone of Indonesia.
It was in a calm atmosphere.
Installing the floor of the master bedroom
Merbau wood flooring.
It is the floor feeling good even walk barefoot.
No comments:
Post a Comment