Showing posts with label Ungasan. Show all posts
Showing posts with label Ungasan. Show all posts

Aug 11, 2018

ANNIVERSARY 11th HORAS !!


 
Thank you for supporting us with lots of supports and warm hearts until today.
PT. HORAS INODNESIA could have celebrated its 11th anniversary this year!





























































































Blow out the candles




 On Saturday, August 11th, we hosted a small anniversary party at the new Horas' office.

 

Thank you to everyone who could manage to came, those who could not come, and those who could not be invited this time.






If you could not manage to joint at our party, we are welcoming you to come and visit our new office. We look forward to.













 


Horas will always continue to power up sooner and better, so please support us :)

If you have some inquiry please contact us ! www.horasindonesia.com

Apr 11, 2018

MARBLE FROM TULUNGAGUNG - EAST JAWA

I went to Tulungagung.
 
Tulungagung is a small town located in the East Java South coast area, but almost near the Central Java. It takes three and a half hours from Denpasar to Gilimanuk Harbor, by Car, and then take a ferry to cross Bali Strait to Banyuwangi, East Java. Then continue the journey around 12 hours more from Banyuwangi to get to Tulungagung. It was a pretty hard drive.

 










 
Turungagung is one of the famous Natural stone product, such as Marble and Andesit in Java.
To be exact,It seems not marble but limestone actually.












 
This time we got order from Australia, bush hammer finish Marble. So We went to Tulungagung for the inspections.


 
 Most of all factories in Tulungagung are small factories, and cutting accuracy is bad to say honestly. Even in that, We will find a factory that will listen to my detailed orders, from the choice of materials to the checking of the precision of the cutting and management of the finished stone one by one.







 





Once it's done, it will ready to be delivered to the warehouse in Bali where the process of packing in crate will be done there.

Container stuffing finally has been done this weekend.
We will safely arrive at your house and wish you a nice finish.


HORAS INDONESIA sells Marble Tulungagung Bush hummer finished. 
Size : 600x600x18mm , 600x600x15mm etc.
For more details, please check our website HERE

Mar 19, 2014

Japanese Style Door

UNGASAN was very sunny today.

Weather suitable to work


At the ANN LIVING & ESTATE VILLA, our construction work almost has finished,
and migrated into the interior works.

  (Villa is sold with ownership,
for more details please contact to HORAS INDONESIA)
  












 If you go into the open in the door of the entrance,There are steps.  

Step to divider the outside or inside

I raise one stage the privacy of the courtyard.


It is a sign that implicitly
  "will be into the private area from here."

  Japanese will become take off their shoes automatically.
 
When I invited a friend to a nice villa, 


 " shoes was scattering " at the entrance, 

it is regrettable. 
The Entrance is the most important of the villa, 

because it is the first impression
So as not to show the place ashamed, 

 We put the shoes box in the entrance ( TATAKI area) 
which you can put a lot of shoes!
 
Now, it is sure that the first impression of the villa you up.

Then, in the hallway that leads deeper into entrance from, it is not directly visible pool

has undergone a partition of the leaf of the tree that only shadow and leakage of light.

Devised that does not directly visible courtyard immediately after entering the front door.

Contrast of the shadow of the plate and the light of day, on the floor of Granite during the day

Emerge.



It reminds us of the entrance of Japanese-style inn, "RYOKAN".

Once in the courtyard, and a pool!

Size of the pool 6X3M 1.2M depth
 
The color of the water in the blue-green natural 

 that put a Sukabumi Green Stone is anything cool.

Because you have incorporated into the design for air passage, 
 the wind blowing through is downright pleasant.

On the part of the overflow, and paved the pebble.
 The folding door in the living and dining

Are fitted.

Design using a grid taste of Japan.

The daytime wind pleasant, in the open door

I will look at the views of the courtyard.

Door to get out in the backyard also I opened, ventilation excellent!

Dining kitchen
At night, close the door when the insect is a concern

Let's turn on the air conditioning.

View through the door of the grid, also views of the courtyard There is a flavor.
 Near the ANN LIVING & ESTATE VILLA, International School is also under construction.
living area
 It is about a 3-minute drive from the villa.

10 minutes drive to Pandawa Beach sea clean.

Golf course of 36 holes so is to open in the near future Pandawa Beach around.

naturally is full of still more around the villa, but it is located in very good access.

The person of the hope, please contact HORAS INDONESIA a tour of the villa.













Mar 7, 2014

PLANTS MAKE THE VILLA COOL !

The ANN LIVING & ESTATE VILLA, I finished in just one step away.

The planting today.

In the courtyard of the pool,

Planting a lawn

The Plumeria in front

I planted.












 In the back garden,

Bamboo.

Bamboo is planted,

On the walls of the spray painting

Shade of bamboo shakes,

In a cool atmosphere.



  





 










Around the pool of overflow, I put the black stones.

 The green stone in the pool and Green planting,


 And theJAPANESE STYLE "KO-SHI" door of the grid

I will make the atmosphere of the STYLISH JAPANESE.


 

 Planting enters, finished soon!

ANN LIVING & ESTATE VILLA is

I am sold with ownership.

Contact us, to PT.HORAS INDONESIA.

Mar 3, 2014

Let's complete

Construction of the villa did not advance as a slow 

since the beginning of the stage and finishing  

the side blow of wind and rain rainy season

the difficulty of arrangements of the craftsman 

 in the construction boom overlap.
 
 

This few days, it has become climate is 


 perfect to finish may take weather.

Now already, let's completion.









Doors and windows so that the final painting
  and installation work, construction completion.
















 




 Installation of lighting and the pool pump is complete.

Test whether it is flowing well in filled with water soon.













Toilet in the master bedroom on the second floor.

It is a toilet scenic.


















Will be introduced the TOTO Washlet.

Delivery time is 4 months for import


 I will take considerable time.

The installation scheduled for this month!


Villa is the planned construction a total 

of two buildings.




 




1 first building will be completed by 


the end of the month now.

I am sold with ownership.

CONTACT HORAS INDONESIA.
 
 

Feb 5, 2014

Just a bit more...

Completion of the villa is also just followed


2ND BEDROOM

When heavy rain falls on Chinese New Year,  

there is a jinx economy is good that year.

This year, heavy rain has been falling all over Indonesia.
  Water under the eaves is still remain submerged in flood




even after two weeks in Jakarta.

 In Kudus village in Central Java,where the 
country side of the craftsmen 
 who are working in the field of our project, Influenced.
Arrange bus so that it can get to another person 
as a result of, river flooding in East Java now.
Blocked the way of the bus, and then starting the
  countryside It took three days to arrive to the site


 I belong to the final sprint finish (?!) Now.

Flooring in the bedroom, is where you begin to paint.


On the balcony of the master bedroom

Handrail has been installed.
  
From the balcony we overlooks the mountains of Bali
that's a wonderful view !
 
 Bathroom of the master bedroom also attach the device, 
such as a faucet or toilet,

It is completed by attaching the glass door of the toilet.

In the bath, We provided with a washing space to wash 
the body in front of Bathtub.

Now, you can soak in the bathtub it after washing 
 the body outside! That's good for save water.



 Toilet, bidet of TOTO

Toilet  in master bedroom and 1F living 

will be set up TOTO WASHLET type TCF491A. 













Master bedroom. Carry-in closet from next week.

We will finish the painting works for wall and floor
 within this week.

The ceiling design in the Master bedroom ,
exposed structure of the roof ,high ceilings.



After furniture set up the, atmosphere will changes,
 stay tuned!



 ANN LIVING & ESTATE VILLA is will be sold  
with FREE HOLD LAND now.

Please contact to PT.HORAS INDONESIA.




Jan 2, 2014

A HAPPY NEW YEAR ! ANN LIVING & ESTATE VILLA NOW PROCESS TO FINISHING

Now the final stage project of ANN LIVING & ESTATE VILLA.

Now we are doing install window and paint wall finishing and installing wood floor.

In December 2013, construction was aborted with intermittent heavy rain.

 

We will finish it to find a fine day.


The basin of the rest room on the 1st floor,

we will put the wash bowl of 

TAMBA-YAKI ware, 

which requested to Japanese artists,to made ​​

just for this villa. Muted colors of blue green,

it looks the sense of quality ! 



The wall finishing in the living room




make texture like SUNA KABE, 

the traditional Japanese finishing textured wall.



 

Installed the window glass... 
  
The wall of the corridor on one surface

Use BLACK KEROBOKAN stone,


the natural stone of Indonesia.

It was in a calm atmosphere.


Installing the floor of the master bedroom

Merbau wood
flooring.

It is the floor feeling good even walk barefoot.

Nov 27, 2013

We will guide you towards inspection of ANN LIVING & ESTATE VILLA

Construction of ANN LIVING & ESTATE VILLA also, finally climax.

Progress was achieved in 75 percent now.
From the Flont elevation, left side room is second bedroom.

The roof of the shed roof with wood sirab.

Second floor left is the bathroom of the second bedroom. 
 
 

 Corridor space is spacious luxury. The wall of the corridor side,using the Black Kerobokan of natural stone so as cool and modern Design.

 

The Second floor of the main building is 

Master Bedroom.

Here is to expose the structure of the roof,

with a feeling of opening high ceiling.

















 

The view from the balcony of Bali  

with a feeling of opening  

The sea and the sky spreads.








 Pool in the courtyard

The elegant overflow

Pool. The wall of the pool

Use the green stone,

Green natural color of the water

Production.
 As viewed the courtyard dining.

I feel wider than the actual site of 200 square meters

It is a layout with a feeling of opening that was spacious.
 For those who you wish to purchase a villa, we guide you through the site.
 Please contact to PT.HORAS INDONESIA  call +62 361 755393  
 And please check our website