Construction of ANN LIVING & ESTATE VILLA also, finally climax.
Progress was achieved in 75 percent now.
Progress was achieved in 75 percent now.
From the Flont elevation, left side room is second bedroom.
The roof of the shed roof with wood sirab.
Second floor left is the bathroom of the second bedroom.
The roof of the shed roof with wood sirab.
Second floor left is the bathroom of the second bedroom.
The Second floor of the main building is
Master Bedroom.
Here is to expose the structure of the roof,
with a feeling of opening high ceiling.
The view from the balcony of Bali
with a feeling of opening
The sea and the sky spreads.
Pool in the courtyard
The elegant overflow
Pool. The wall of the pool
Use the green stone,
Green natural color of the water
Production.
The elegant overflow
Pool. The wall of the pool
Use the green stone,
Green natural color of the water
Production.
As viewed the courtyard dining.
I feel wider than the actual site of 200 square meters
It is a layout with a feeling of opening that was spacious.
I feel wider than the actual site of 200 square meters
It is a layout with a feeling of opening that was spacious.
For those who you wish to purchase a villa, we guide you through the site.
Please contact to PT.HORAS INDONESIA call +62 361 755393
Please contact to PT.HORAS INDONESIA call +62 361 755393
No comments:
Post a Comment